Skip to reading

Meet the editors.

The BBD Buy Review Desk newsroom publishes guides and reviews under named editors with published methods.

  1. Marissa Cole

    Editor in Chief

    Marissa Cole

    Hands-on product testing, buying-guide structure and five-point score calibration for the bbd-buy catalog.

    Marissa Cole sets the testing standard at BBD Buy Review Desk and keeps the master testing log for its flagship reviews. Personal orders and an initial fit check are followed by three timings of agent tasks, with the same steps repeated after 14 days. Comparison tables and scheduled retests connect those observations with the desk's five-point scores and buying-guide structure. Marissa approves a final score only once the comparison table has been built and the retest date has been entered, making those records part of the editorial approval process.
  2. Priya Raman

    Reviews Editor

    Priya Raman

    Long-form review editing, comparison tables, fit checks and reader-facing score explanations.

    Priya Raman edits reviews at BBD Buy Review Desk and keeps comparison tables consistent across the bbd-buy catalog. Rebuilding tables from raw notes and checking scores against the five-point scale are central to that work, alongside flagging claims without a corresponding test log entry. Priya also runs the second fit check and 14-day repeat test on most reviews, times agent tasks and records grip and balance observations. These duties connect long-form editing and reader-facing score explanations with the measurements and notes behind each review.
  3. Tomas Berg

    Research Editor

    Tomas Berg

    Supplier documentation, specification verification, agent-timing research and correction checks.

    Tomas Berg researches specifications at BBD Buy Review Desk, comparing supplier documentation with the unit on the bench. Checks for packaging or material changes are accompanied by measurements against listed specifications and a record of any mismatch. Tomas also handles the agent-timing sheet, the 12-month retest calendar and the corrections log. When a correction is requested, the original test log is reviewed before an update is published, connecting specification research, timing records and subsequent editorial changes through the same source material.